24-26 City Quay Fit Out
Client:
Private
Architect:
KMD
Investment Managers:
Irish Life Investment Managers
Engineers:
O’Connor Sutton Cronin, DBFL
Project Overview
KSN provided full cost consulting services for a private client on the 24-26 City Quay fit out.
The project consisted of an existing CAT A strip out and the installation of a CAT B fitout for a multinational corporation to their specific requirements. Adjustments were made to the existing level access to the external terraces via the installation of a flexstep (see image).
PC was achieved on this very ambitious programme in early December 2021 with a timeline of just over 6 months. This ran from pre-contract/budget sign off to practical completion together with a 2-stage tender to ensure occupation was achieved as desired.